Project history Gallery
Get inspired by our latest projects
Shaikh Rakan Al-Rajhi
2017
Fitout
- Project Size: 32,000 sq m
- Project Duration : 30 Months
- Designer : Eng. Wael Al-Masri
- Design Consultant: Harasani Const.
- Location: Riyadh
Al-Morshid Villa
2019
Fitout
- Project Size: 28,000 sq m
- Project Duration : 21 Months
- Designer : Eng. Eliyas Hadad
- Design Consultant: Experts Conslt.
- Location: Riyadh
Jood Tower-Flat 906-915
2020
Furniture
- Project Size: 900 sq m * 10 Flats
- Project Duration : 18 Months
- Designer : DSID
- Design Consultant:
- Location: Riyadh
Mr. Mishal Altheeb Villa
2022
Fitout
- Project Size: 25,000 sq m.
- Project Duration : 18 Months
- Designer : DSID
- Design Consultant:
- Location: Riyadh
Eng. Abdullah Alsohaili
2023
Fitout-Renovation
- Project Size: 690 sq m.
- Project Duration : 12 Months
- Designer : DSID
- Design Consultant:
- Location: Riyadh
CBRE
2024
Fitout
- Project Size: 610 sq m.
- Project Duration : 18 Months
- Designer : DSID
- Design Consultant:
- Location: Riyadh
Other Projects
2017-2024
Design, Fitout & Furniture
- Project 7-1: Ahmed El Shithri Law Office.
- Project 7-2: Skinova Health care.
- Project 7-3 : Stella Corner
- Designer : DSID
- Location: Riyadh