Year 2014
-
Client
King Abdulaziz Conference Center. (Conference Palace)
-
Year
2014
-
Scope
Installing Systimax cat 6a cabels, from the control cabinet to each access point (Aruba Instant Access Point), Full coverage wifi Signal in meeting and dinning hall, both of the halls connected to each other with fiber obtics multi mode as uplink (10 gb).
-
Note
Main contract : AWAL. one of STC Sister company for special projects.