Project history Gallery
Get inspired by our latest projects
King Abdulaziz Conference Palace
2014
Data & WiFi Solution
DSIT as a supcontractor for STC (Awal), Supply and install Aruba wifi soltion to cover the meeting hall and the dinning hall.
Prince Palace (Private)
2015
WiFi Solution, Data, IP Phone, IP TV, & CCTV
DSIT as a subcontractor for ASCON Co. Supply and install :
(1) Aruba wifi solution covering indoor all the place buildings [16 buildings] and around 16,000 m2 of land scabe. (2) Avaya PBX, with 216 phones sets. (3) Panasonic cctv, bullet [qty 54], and dome [qty 26]. (4) Data solution, Active from Cisco, and Passive from Systimax-Commscope. (5) Arentio IP TV solution from Televes [Spain].
Princess Nourah Bint Abdulrahman University
2016
Light, Sound & curtains/drapes
1) Install & configure Smart lighting control (ON/OFF and dimming) for stage, theater hall and room services. 2) Surround System install & configuration for stage and studio room this room as 2 (mixer 12×12 dp) .3) Designe, Supply and install custom curtains/drapes (62 cutains and/or drapes).
National Guard Hospital - Central Laboratory
2017
Data, Audio/Video, Plumping (water, Sewage, air pressure and storm water)
Supply & Install all EMP to support Abbott laboratory machines control room and visitors hall.
Princess Office (Private)
2018
All Low Current, Electrical work and decoration and furniture work.
Full decorative work with low current system (IP Phone, Data, Wifi, MATV, Intercom and access door system
Shaikh Palace (Private)
2019
Electical and Low Current work
Electrical work (Light, Power and generator room) and all low current system (IP TV from Exterity, IP Phone from Avaya, CCTV from Hikvision, Access door from ZK, pasive componants from 3M, active components from Cisco, HP & FortiNet).
Princess Office (Private)
2020
Low Current work
Low current system (MATV from Next, IP Phone from Avaya, CCTV from Hikvision, Access door from ZK, pasive componants from Commoscop, WiFi from D-Link, active components from LinkSys, HP & D-Link).